Note: The entire installation process requires two people to work together. It needs the assistance of dismantling or hoisting tools.
How to install BZJ13 spring machine?
Installation steps of paying off rack.
Install the reinforcing screws
Install the reinforcing screws
Place the front and rear fixing plates at the designated positions
Mounting screws
Remove the associated line, power line, etc.
Install associated lines, power lines, etc.
Installation steps of spring machine host.
Insert the roller into the opening.
Mounting screws
Rotary retainer
Install the baffle
Installation steps of feeding manipulator
Lift the cloth guide to the specified position.
Mounting screws
Lift the feeding arm to the designated position with the disassembly or crane.
Pay attention to the interface position.
Mounting screws
Note: The entire installation process requires two people to work together. It needs the assistance of dismantling or hoisting tools.